  1. Primavera p3 for windows software#
  2. Primavera p3 for windows windows#

Alternatively, if already in PERT format, then you can choose Bar Chart to go back to the bar chart display. PERT: converts the display to a precedence (activity on the node) network format. Planning & Control Basic Layout of P3 _ 3. Note that, activities can also be input and edited within a network in a graphical mode. Edit project activity network:    Ĭut: memorize then cut selected activities. Select drive, directories/subdirectories, and filename. New…: open a new project file (you must use 4 character project names). This provides a variety of subcommands concerned with file opening and closing (a file stores all information pertaining to a P3 user generated project), the main facilities being:     Instruction 1.5: The main command menus, and most important commands are as follows: 1. Subsequent command items are more specific about their function. Initial command item selected (eg: FILE) is a general menu. Instruction 1.4: Commands are provided in a tree structured menu at the top of the window.

Primavera p3 for windows windows#

Other windows are displayed in the background Select a window as active by clicking on it. The active window is displayed at the front. Several windows can be open simultaneously. Planning & Control Basic Layout of P3 _            A window provides a variety of functions and work areas:  Instruction 1.3: P3 is Windows oriented: 1. You should be presented with a menu for performing tasks such as CUT and COPY of the activity.

primavera p3 for windows

Right button, click and release = go to a deeper level of information topical to the region selected. The activity form should appear at the bottom of the screen showing information on activity System Design.  If there is a large gray information box covering approximately the lower third of the screen (the so called activity form), then you should hide it by pressing the key. Left button, double click and release (rapid) = select and execute item indicated go to a deeper level of information/options topical to the item selected. The activity AS101 should now be repositioned after activity CS440.  In the Activity ID area of the screen, click activity AS101 and drag to just beyond CS440. All activities between these two should be highlighted.  In the Activity Description area of the screen, click and drag to select from activity System Design to activity Review and Approve. Left button, click down and drag and release = select region or move an object. This activity should now be highlighted, indicating that you may now perform some function on it, such as to delete it. Left button, click down and release = select or deselect. Select FILE  OPEN, then select the project file APEX (so that it is highlighted)  click on Exclusive (so that I is checked – this gives you more control when editing a project)  OK This sample project will be used as a demonstration in the following instructions. Load your student (demo) version of Primavera Project Planner (P3) on your computer (in a subdirectory of your choice), in accordance with the software’s instruction manual.

primavera p3 for windows

Instruction 1.1: Setting-up and running Primavera Project Planner (P3). Note, text that is underlined requests you to do something.

Primavera p3 for windows software#

Tutorial 1: Basic Layout of Primavera Project Planner (P3) In this tutorial, you will obtain an overview of the basic layout, features and usage of the P3 software package.